CLEARING AND BRIDGING
Clearing and bridging aims to facilitate access to the track that will be passed.with maximum width of 2 meters,is bridging the through the river,canals,valley,or swamp,there are two types of bridgings :
- On the ply
- On the ground.
Quality initiated and bridging must be good and right, because an effect on the work of drilling and recoording.For the areas to be made strairs or uphill slep,
to facilitate the drilling crew and recoording transportation equipment.As for other forms of bridging usually,adjusted conditions in the field including :
- Platform (for storage of drilling pipe).
- Jety (pier to facilitate anchor in crossing river,usually used along side a river.
To check quality control intiated and conducted by bridging line checker.
Line checker on duty to give a assesment of bridging the physical condition.
- Fair : Condition between 75-90%
- Good : conditions in accordance with the agreements.
- Poor: conditions that do not comly with the agreement.