Process Measurment Total Station |
1. Measurment traverse ,this measurment is essentially bound to make a perfect polygon of GPS points,which has been observed,which was made in the control placement of traverse points in the place sepressi possible with the intersection line,rejuvanate the start line.
2. Translock coordinates,on principle this process is same as the binding to the faces of polygon,where the set 2. Pieces of GPS point in determining the point translock belt.Before performing topographic measurments,firts,conducted in coordination with departements and other sub-jobs, especially those adjacent to the measurment time job topography,such as path ,bridging and drilling.This is done so that does not happen the chase time job,let alone overlap.After disscussion made the program schedule.The first program topography measurment ,which in turn followed path,bridging,drilling,recoording .Department of topo also do work side by side against the other department such as explanation access location, the existence of trace stakes and shoot point ,until the offset and compensation.Tecnically,before doing stake out work,first ferformed to define the azimuth measurment sunshot beginning of the start point line.Further measurments were taken stake out,which coordinates the existing theoretical and entered on memory device and asked to determine the coordinates of the trace point and shot in the field .The points trace and shot point is determined from the points already fixed polygon or in other words the points polygon is a point of basic frame work.At the end of the measurment was repeated sunshot as the final azimuth control and then crossing between the line.Then fix the binding,at that point,the process of 3D seismic stake out the coordinates.measurments were taken at the start line,then tied in a single block,to get the cordinates of the point of each loop block. The block are separated into several swath according to the number of SL and RL,block width is adjusted with the precision of the distance.Each block covers precision is inversely proportional to its distance,then a big correction. As much as possible this block to close at each end of the SL and RL,so that the coordinates of the point produced mord good blocks. At the time of measurment,were also planting seismic BM. BM is made to reconstruct the point line is needed, if any program devolopment survey .BM seismic are :
- Uneven distribution of BM (cover) the whole line .
- To socialize with people .BM is an important point not tobe disturbed. BM seismic and BM GPS is a point for defining the datum if the reconstruction will be done.